Shallow Sub-Base
A base compacted to the wrong depth cracks under freeze-thaw pressure within two or three seasons.
Depth Set by Soil Data
Sub-base depth is calculated from the on-site soil assessment, not a one-size spec applied to every job.
Your Yard, Your Court
A properly drained, regulation-ready court that holds up through Richmond’s clay soil and freeze-thaw seasons.
What Goes Wrong
Most backyard court failures trace back to decisions made before the first shovel breaks ground.
A base compacted to the wrong depth cracks under freeze-thaw pressure within two or three seasons.
Sub-base depth is calculated from the on-site soil assessment, not a one-size spec applied to every job.
Standing water on a flat pour softens the sub-base over time and lifts the acrylic coating from below.
Surface slope and drainage outlets are designed at the scoping stage so water clears the court after every rain.
Lump-sum quotes hide what is and is not included, leaving room for change orders once excavation starts.
The written estimate separates excavation, base prep, surfacing, fencing, and line marking as individual cost lines.
Starting construction without HOA design review approval can force a stop-work order mid-pour.
HOA design review paperwork is prepared during scoping so approvals are in hand before construction begins.
Why Us
Local knowledge, fixed scope, and a clear process from first call to final walkthrough.
No estimate is issued until an on-site drainage and soil check is complete for your specific lot.
Base prep, surfacing, fencing, and line marking each appear as separate line items in the written estimate.
We cover all three counties, so site knowledge is never borrowed from another region.
Design review paperwork for community associations is prepared during scoping, before any ground is broken.
Surface finish, regulation line marking, and drainage flow are all confirmed before the job is signed off.
The Process
We arrange an on-site visit to assess soil type, slope, drainage, and your available footprint before any pricing begins.
The itemized written estimate lists excavation, base, surfacing, and line marking as separate cost lines.
Construction runs to the fixed scope, closing with a final walkthrough that confirms surface, drainage, and line marking.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Simple backyard court | $15,000-$25,000 |
| Standard backyard multi-sport court | $20,000-$35,000 |
| Large or feature-rich backyard court | $35,000-$60,000 |
Common Questions
A half-court basketball setup fits in roughly 30 by 25 feet. A full pickleball court needs at least 44 by 20 feet, plus a buffer around the lines. The on-site evaluation measures your usable footprint and flags any grading work needed to make it work.
Clay-heavy soil expands when wet and contracts when dry, which cracks a slab poured directly onto it. A compacted aggregate sub-base at the correct depth absorbs that movement. The required depth depends on your specific soil profile, which is why an on-site assessment comes before any spec is written.
Standing water softens the sub-base and works under the acrylic coating, causing bubbling and surface lift within a few seasons. Repairing that damage costs more than installing correct drainage slope at the outset.
Permit requirements vary by county and lot size. Chesterfield, Henrico, and Goochland each have their own thresholds for impervious surface additions. The scoping process identifies which permits apply to your site before construction is scheduled.
Yes. HOA design review documentation is prepared during the scoping stage so approvals are secured before any ground is broken. Starting construction without that approval risks a stop-work order mid-pour.
A single slab can carry multi-sport line marking for basketball, pickleball, tennis, and volleyball. Line layouts are confirmed in the written estimate so the correct court dimensions are built into the surface from the start.
Share the location and intended use, and we’ll arrange an on-site evaluation with a written estimate covering every cost category.