LED sports lighting requires pole footings set in concrete before the surrounding surface is finished. Positioning poles after the court is poured means cutting into the finished surface and risking drainage disruption. We include lighting layout in the initial site plan so footings are placed during the sub-base phase at no extra excavation cost.
Fencing setbacks vary by county and by whether the court sits inside an HOA community. The scope identifies the correct setback distance for your site and specifies post depth, gauge, and coating, chain-link or vinyl-coated, before the itemised written estimate is produced. That prevents change orders when the fence contractor arrives.
Light pole height and fixture spacing are calculated to deliver even lux coverage across the full court surface. The final walkthrough checks that illumination is consistent, fencing gates open and latch correctly, and all electrical work meets the applicable county inspection standard before the project is signed off.