Wrong Drainage Slope
A flat pour looks fine until water pools at the baseline and softens the sub-base beneath the acrylic coating.
Slope Built Into Sub-Base
The 1-percent drainage slope is graded into the compacted base layer, not corrected with surface patching after the pour.